The two newly installed 75MN extrusion presses in Zhongwang’s industrial aluminum processing workshop in Liaoning have been put into production after a period of inspection and testing.
As an integral part of China Zhongwang’s capacity expansion project for the production of large-scale aluminum extrusion products, the installation and application of these two units of new 75MN extrusion presses has always been the focus. With the efforts of the Group’s different units including the mechanical engineering workshop, industrial aluminum processing workshop, smelting and casting workshop, equipment division, electric power division, transportation division and engineering management division, the installation and inspection of the two units of 75MN extrusion presses has been completed as scheduled.
The two new extrusion presses give immediate excellent performance after they have been put into production. This is not only reflected in their speedy operation in producing industrial extrusion products with outstanding quality but also in their high level of automation. The characteristic of advanced large-scale extrusion equipment stands out when having mass production of industrial aluminum extrusion products. With the Group’s continuous growth in the production of industrial aluminium extrusion products, the contribution of these two new units of 75MN extrusion presses will be fully maximised.